Book 1: 22
Book 2: 11
Click Here for Book 1 and Book 2 Referral and Resign Information
BOOK 2 SIGNS ARE TO BE DONE BY EMAIL/FAX FROM HOME LOCAL or IN PERSON
TO BID ON A NEW CALL:
You must leave a message on the Job Line between 5:00 P.M. and 8:00 A.M.
Anyone ineligible for a call due to vaccine status or background check must call the jobline each call to prevent a strike/ding
(269) 382-1762
TO ACCEPT AN OPEN CALL:
Please call the Hall during normal business hours.
(8:00 A.M. to 4:30 P.M.)
New CallOpen Call Closed Call
Click herefor Michigan State Licensing Information
ClickhereJIW WageBreakdown
Gurtz Electric
(4) JIW, Pfizer MAP
Req. Date 7/3/2024, Start 7/11/2024
Schedule: 50hrs 7AM to 5:30PM, Mon-Fri, 8-10 weeks
Contractor Onsite Drug Testing, Tobacco Free Site
KEI Electric
(0 of 8 JIW Filled), Graphic Packaging Inc, Kalamazoo
Req. Date: 7/2/2024, Start: 7/12/24
Schedule:40hrs Mon-Fri (some OT), 8-10 week duration
SS Card, ID Required, New captive boots required with $150 Stipend
KEI Electric
(0 of 8 JIW Filled),Abbott Laboratories Summer Shutdown, Sturgis, MI
Req. Date: 7/2/2024, Start: 7/12/24
Schedule: 5-10s Mon-Fri (some Sat & Sun), 6-8 week duration
SS Card, ID Required, New captive boots required with $150 Stipend
Hi-TechElectric-
(0 of 4 JIW Filled), Abbott Laboratories Summer Shutdown, Sturgis, MI
Req. Date:7/2/2024; Start Date: July 15th
Schedule: 6x10's, Mon. - Sat. w/ Some Sundays; 6 Week Call
Captive boots, $150 Stipend for new boots with 1st check, must have new & clean boots for jobsite
Hi-TechElectric-
(0 of 1 - 12.5% Foreman), Various Locations
Req. Date: 6/28; Start Date: ASAP; 7:00AM - 3:30PM M-F; Indefinite
Position Contingent on Interview, Current MUST Drug Test; MI StateJourneyLicense
Moore Electrical-
(0 of 1JIW Filled); ZoetisDowntown Kalamazoo
7am - 3:30pm Mon - Fri Indefinite, Start ASAP
MI JIW License, MUST drug test within 60 days, Background Check
Nitro Electric
(0 of 2 JIW filled) Consumers Concrete (Kalamazoo), Posted 6/27/24
Shift: Six 8-hour days, Mon-Sat, more than 80 hours
2 forms of ID required
Champion Specialty Services- Daybook x 3
(Posted5/20/24, Updated 6/26)(4 of10 JIW filled), Palisades Nuclear Facility (Working under Local 131 contract)
Report: two weeks after bidding, 6:30AM to 5:00PM, M-T 10 hours, Friday OT when necessary
Background check up to 2 weeks before start
Contractor Drug Testing, Background Check, NMAP
Martell Electric-
(0 of 1 JIW Filled - 0 of 1 CE Filled) Service - Various Locations; Indefinite
Req. Date: 6/21/24; Start Date: 6/24/24
MUST Drug Test Required
Moore Electrical- Daybook
(1 of 7JIW Filled, updated 6/27); Zoetis B248, Req 6/20
(5x10's, 8's Sat)6am - 4:30pm Mon - Fri; 6am - 2:30pm on Saturday; Indefinite, Start ASAP
MI JIW License, MUST drug test within 60 days, Background Check
KEI Electric
(1 of 4 JIW Filled),Graphic Packaging Inc(Kalamazoo)
Req Date 6/18, Start 6/19 through September, 7:00AM-3:30PM, M-F, possible OT
SS Card, ID Required
Nitro Electric - (2) Book 2
(2 of 5 JIW Filled), Vicksburg High School
Req Date 6/11; Start 6/13 @ 7:00AM - 3:30PM
2 forms of ID for on-boarding
Hi-TechElectric- Day book x 3 - Updated 6/6/24, increased to 3 CE's
(2 JIW Filled & 1 of 3 CE Filled), Various Locations
Req. Date: 3/26; Start Date: 3/28; 7:00AM - 3:30PM M-F; Indefinite
Background Check; MUST Drug Test; MI State JIW License
Hi-Tech Electric -
(0 of 3 JIW Filled) (0 of 1 CE Filled); Vicksburg Middle School; 7am - 3:30pm M-F; 2-3 Month Call
Req. Date: 6/3; Start Date: 6/10 - 8:00am @ Shop
MI JIW License, MUST Drug Test, Background Check
KEI ECM
(1 of 4 JIW Filled); Various Locations; 40 hours with occasional OT; Indefinite Call
Req. Date: 5/28/24; Start Date: ASAP
Hi-Tech Electric
(0 of 1 JIW Filled) **Updated 6/3/2024
South Haven Water Treatment Plant & Various Locations; 7am-3:30pm
Req. Date: 5/15/24; Start Date: 5/20/24; Duration: Through Summer 2025
Required: MI JIW License & MUST Drug Test
Hi-TechElectric- (3) Book 2, (1) Book I, Daybook
(5 of8 JIW Filled,increased April 3rd), Pfizer
Start Date: 1/24/2024; 7:00AM - 3:30PM; Indefinite
Background Check; MUST Drug Test
Moore Electrical-
(1CE);Shop
6am - 2:30pm Mon - Fri Indefinite, Start ASAP
MI JIW License, MUST drug test, Background Check
Hi-Tech Electric
(1 JIW filled); Kalamazoo College; 7am - 3:30pm M-F; Indefinite
Req. Date: 6/3; Start Date: 6/5 - 8:00am @ Shop
MI JIW License & MUST Drug Test
Moore Electrical - Contractor Canceled Call 6/19/24
(2 of 4 JIW Filled); Gun Lake Casino; 6am - 2:30pm M-F; Indefinite
Req. Date: 6/4; Start Date: 6/10 @ 6am
Requirements: MI JIW License, Background Check, Current MUST Drug Test
Moore Electric-(1)Daybook & Contractor canceled remaining call 6/17/24
Cancelled (3 JIW, 1 FRMN 12.5%) Pfizer
Req. Date6/10; Start 6/12, 7:00am to 3:30pm, possible OT
Background check, MI JIW License, MUST Drug Test, 2 forms of ID
Fuller Electric
(1 of 1 JIW Filled); Various Locations; 7am - 3:30pm M-F; Indefinite
Req. Date: 6/4; Start Date: 6/17 @ 8am
Requirements: MI Master's License, MI JIW License, Welder, Experience in Generators, Residential, and Service
Hi-Tech Electric- Contractor Closed Call 6/17/24
(1 JIW), American Axle Manufacturing, Three Rivers
Shift: 6AM to 230PM
Req. 5/31/2024, Start 6/03/24, Indefinite
Mi State License Required, current MUST Drug Test
Moore Electrical- This call has been updated 4/24**
(4 of 4 JIW Filled,increased April 24th); Zoetis B248 - Various
(5x10's, 8's Sat)6am - 4:30pm Mon - Fri; 6am - 2:30pm on Saturday; Indefinite, Start ASAP
MI JIW License, MUST drug test within 60 days, Background Check
Martell Electric- (1) Book 2
(1 of 2 JIW Filled)Woods Lake - Lighting Project
Start Date: 5/28/2024; 6:00am - 2:30pm M-F; Short Call
MUST Drug Test Required
Linear Electric - Book 2
(1 JIW) Paw Paw Schools; 7am - 3:30pm M-F; 4 Month Call
Req. Date 6/5; Start Date: 6/10; Report to Jobsite
Required: MI JIW License & Background Check
Linear Electric - #6
(1 JIW); Paw Paw School; 7am - 3:30 M-F; 7 Month Call
Req. Date: 6/4; Start Date: 6/7; Report to Jobsite
Hi-Tech Electric- Contractor Canceled Call 6/5/24
(1 JIW); Meijer Remodel; Three Rivers
Shift: 7AM to 330PM
Req. Date: 5/31/2024; Start Date: 6/03/2024; Duration:9-10 Months
Required: MI State JIW License and current drug test
KEIElectric-#7 & Daybook
(2 JIW)- Multiple Locations
40 hour indefinite call, 7AM Start
Req. Date: 5/13/24
Nitro Electric - Daybook
(2 JIW) Consumers Block Plant - Kalamazoo
7am-3:30pm M - F; Indefinite
Req. Date: 4/29/24
Hi-Tech Electric- Daybook
(1 JIW); Meijer Remodel; Three Rivers
Req. Date: 5/13/2024; Start Date: 5/14/2024; Duration: 10 Months
Required: MI State JIW License and current drug test
IBID Co. Electric:Bk1 #1 & 2
(2 JIW); Welch's - Paw Paw
Req. Date: 5/1; Start Date: 5/6; 6am Start; 5x10's, then 6x10's; 8 Months Duration
MI JIW License, Safety Glasses & Steel Toed Shoes
Moore Electrical-
(1JIW); Pfizer
Req. Date: 4/29; Start Date: 5/6; 7:00AM - 3:30PM; Indefinite
Required: MI JIW License, MUST drug test within 30 days, Background Check
Moore Electrical- Daybook
(2 JIW);Gun Lake Casino
Req. Date: 4/18/24; Start Date:4/22/24; M-F 6AM-4:30PM, OT for several weeks, subject to change*
Required: MI Journeyman License, MUST Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Centennial Electric - (2) Daybook
(2 JIW)
Req. Date: 4/17/24; Start Date: 4/22/24; 7:00AM - 3:00PM;
Gun Lake Casino; Duration: 1 Month
MI JIW License
Centennial Electric#14
(1 JIW)Req. Date: 4/10/24; Start Date: 4/15/24; 7:00AM - 3:00PM;
Gun Lake Casino; Duration: End of Year
MI JIW License
Moore Electrical- Book II
(1JIW); Pfizer - Various
Req. Date: 3/15; Start Date: 3/19; 6:00AM - 2:30PM; Indefinite
Required: MI JIW License, MUST drug test within 30 days, Background Check
Moore Electrical-Daybook
(5 JIW - Increased Call 3/19);Gun Lake Casino
Req. Date: 2/27/24; Start Date: 3/4/24; M-F 6AM-2:30PM, Possible OT; Indefinite
Required: MI Journeyman License, MUST Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Gurtz Electric-
(1 JIW), Pfizer MAPS
Start4/5/247AM-3:30PM, M-F
Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule
Moore Electrical - Bk I #10, #12
(2 JIW); Zoetis B248 - Various
Updated: 3/21; Start Date: 3/21;(5x10's)6:00AM - 4:30PM Mon - Fri; Indefinite
MI JIW License, MUST drug test within 60 days, Background Check
Moore Electric- Daybook
(2 JIW),Zoetis PortageSite
Start Date: 2/15/24; (Four 10s) 6:00AM - 4:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical- Daybook
(1JIW);Gun Lake Casino
Start Date: 2/14/24; M-F 6AM-2:30PM; Indefinite
Required: MI State J-man License, Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Champion Specialty Services- Daybook
Please Note: This is a National Labor Agreement Contract.Clickherefor details
Requested 2/5/24, (2 JIW), Palisades Nuclear Facility
Report: 2/7/24, 6:30AM to 5:00PM, M-T 10 hours, Friday OT when necessary,
Background check up to 2 weeks before start
Contractor Drug Testing, Background Check, Masks Required, NMAP
Moore Electric- Canceled Call
(2 JIW), Pfizer
Start Date: 1/25/2024; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical-#17, #2, & (2) Daybook
(4 JIW);Gun Lake Casino
Start Date: 1/9/24; M-F 6AM-2:30PM; Indefinite
Required: MI State J-man License, Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
ICC Electric -#9, CE
(2 JIW) - FlavorSum Kalamazoo
Start Date: 1/25/24, (Four 10's) 7AM
Applicant must have 2 forms of ID
Flemington Instrumentation- (1) Book 2
(cancelled); Pfizer MAPS; Portage
Start Date: 1/15;4-6 Week Call
58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays; OT not guaranteed
Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Please bring Driver's License, SS Card, and OSHA Card.
Moore Electric- Daybook
(2 JIW),Zoetis PortageSite,
Start Date: 1/8/2024; (Four 10s) 6:00AM - 4:30PM; Indefinite
MI State License, Background Check; Drug Test
Hi-Tech Electric-
(1) CE, Various Locations
Start Date: 1/25/24, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test,Driver's License, SS Card
Hi-Tech Electric- # 17, (3) Daybook, (1) Book II
(5 JIW),Pfizer Portage Site
Start: 9/14/23, 7AM - 3:30PM,Indefinite
Moore Electric- 17
(1)JIW,Zoetis DowntownSite,
Start Date: 1/8/2024; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; Drug Test
Champion Specialty Services- Daybook
Please Note: This is a National Labor Agreement Contract.Clickherefor details
Requested 11/13/23, (filled) JIW, Palisades Nuclear Facility
Start 1/2/23*, 6:30AM, M-T 10 hours, Friday OT when necessary
Contractor Drug Testing, Background Check, Masks Required
Riverway Electric- Bk I #24
Requested Date: 12/21/2023 - 1 JIW; Fresh Thyme on Westnedge in Portage
Start Date: 1/15/2024; 10:00PM-6:30AM; 4-5 Nights
Converting Fluorescent Lighting to LEDS
Michigan State JIW License Required; Must bring ID & SS card for new hire paperwork.
KEI Electric -Daybook, (2) Book II
(5 filled)JIW,Multiple Locations
Start Date: 10/9/23,7:00AM - 3:30PM; Indefinite
SS and Drivers Licensed Required
Moore Electrical-
(1) CE,Shop
Start Date:12/4/2023; 1st Shift; Indefinite
MI State License, Background Check; Drug Test
Martell Electric - #22
Requested 10/23/23, (1) JIW, Woods Lake Elementary
Start 10/24/23; 6AM to 2:30PM, M-F
Current MUST Drug Test required, ID/SS# required
KEI ECM
(1) VDV Tech
Start Date: 10/11/2023; 7:00AM - 3:30PM; Indefinite
Gurtz Electric-(1) Book II, (1) Daybook , Closed
(4 of5 filled)JIW, Pfizer MAPS
Start 7/11/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM
Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule
Flemington Instrumentation- (1,2, 2 x Day Book)
(4of 4 filled) JIW; Pfizer MAPS; Portage
Start Date: 10/16; 6-Week Call
58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays, OT not guaranteed
Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Michigan State License Required
Moore Electrical: Closed
(2)JIW; Gun Lake Casino
Start Date: 10/10/23; 7:00am; Indefinite
Required: MI State JIW License, Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Moore Electrical- Closed
(2) JIW, Pfizer Portage Site,
Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical- Closed
(1 of 3 filled)JIW,Zoetis DowntownSite,
Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical- Daybook, #18
(2 of 2 filled JIW),Gun Lake Casino; New Construction
Start Date: 9/26/2023; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical- #23,2x Book II
(3 of 3 JIW Filled),Gun Lake Casino; New Construction
Start Date: 9/18/2023; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Shaum Electric - Day Book , Closed
(1 of 2 JIW Filled) JIW; Tek Modo; Three Rivers
Start: 6/20/2023; 7:00AM - 3:30PM M-F; 5-6 Months
Required: Michigan Journeyman Electrical License
Moore Electrical(Daybook) Closed
(2 of 3 filled) JIW, Various Location
Start Date: 8/21/2023; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; MUST Drug Test required
Flemington Instrumentation- #18, daybook x 3
(4 of 4 filled) JIW; Pfizer MAPS; Portage
Start Date: 7/24/23; 6-Month Call
58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Michigan State License Required
Gurtz Electric-(5) Book 2's
(5 of 5 Filled) JIW, Pfizer MAPS
Start 6/19/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM
Michigan State Journey License and Onsite Drug Testing required
Hi-Tech Electric- Daybook
(1) JIW, Service Truck, Various Locations
Start Date: 8/7/23, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Moore Electrical (Daybook x 2)
(2) JIW, Gun Lake Casino; New Construction
Start Date: 8/15/2023; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Block Electric- #22
(1) JIW, Meijer in Plainwell
Start Date: 8/7/23, (2nd Shift) 5:00PM Start, 4/10s M-T, 8 week duration
2 forms of ID and Information for Direct Deposit required
Nitro Electric - #21
(1 of 2 filled) JIW, Vicksburg High School
Start Date: 6/12/23, 7AM-3:30PM
Michigan State Journeyman License, Background Check, Personal ID required
Hi-Tech Electric - Cancelled
(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers
Start Date: 6/6/2023;6:00AM - 2:00PM
Michigan State JIW License,Personal ID
Hi-Tech Electric - Cancelled
(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers
Start Date: 6/6/2023; 2:00PM - 10:00PM
Michigan State JIW License, Personal ID
Hi-Tech Electric _Daybook
(Filled) JIW, AAM Maintenance - Three Rivers
Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call
MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.
Martell Electric- #23
(1) JIW, Loy Norrix HS
Start Date: 7/21/23, 50 hrs, 6AM - 4:30PM M-F, Summer
Current MUST Drug Test Required
Martell Electric-
(2 of 2 filled) JIW, Loy Norrix HS
Start Date: 7/27/23, 50 hrs, 6AM - 4:30PM M-F, (Edit)Short Call 2-weeks
Current MUST Drug Test Required
Martell Electric:
(2 of 2 filled) JIW,Gull Lake Middle School
Start Date: 7/25/23, 50 hrs, 6AM - 4:30PM M-F,Summer
Current MUST Drug Test Required
Hi-Tech Electric- Daybook
(1) JIW, Service Truck, Various Locations
Start Date: 7/17/23, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Newkirk Electric:(Cancelled)
(0 of 1 Filled) JIW, Covert Generating Plant
Start 6/14/23, (4) 10's, 7AM to 5:30PM Mon - Thurs; 2 Months
MI State Journeyman License, current MUST Drug Test, and Background Check Required
Flemington Instrumentation(3x Day Book)
(0 of 3 open) JIW; Pfizer MAPS; Portage
Start Date: 6/27/2023; 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Martell Electric: Daybook
(1) JIW,Gull Lake Middle School
Start Date: 7/17/23, 6AM - 4:30PM M-F,Summer
Current MUST Drug Test Required
Moore Electrical-#25, #26, (2) daybook
(0 of 4 open) JIW, Zoetis
Start 7/17/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, Drug Test, 2 forms of ID required
Block Electric#19
(1) JIW, Meijer in Plainwell
Start Date: 7/10/23, (2nd Shift) 6:00PM Start, 4/10s
2 forms of ID and Information for Direct Deposit required
Martell Electric
(1) JIW, Loy Norrix HS
Start Date: 6/27/26, 6AM - 4:30PM M-F, 2 month duration
Current MUST Drug Test Required
KEI Electric: #21, Day Book
(0 of 2 open) JIW, Graphic Packaging Inc
Start 6/15/23, 7AM-3:30PM, Mon - Friday
Michigan State Journeyman License required.
Martell Electric- #4
(1)Service Truck Driver
Start Date: 7/17/23, 7:00-3:30PM M-F,Indefinite
Current MUST Drug Test Required, Michigan State Electrical License, Driver's License
Hi-Tech Electric - Daybook
(1) JIW, Service Truck
Start Date: 6/12/23, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Climax Construction- Book II
(1) JIW; Various Locations; Residential Solar Installations
Start Date: ASAP; 8-12 Hour Shifts, Starting at 6:00AM (M-F &OccasionalSaturdays)
Michigan State License Required
Martell Electric - #2
(1) JIW; KPS Wood Lake Elementary - Commercial Electrical
Start Date: 6/12/23; 7:00 AM- 3:30 PM; 3-4 Month Call
MUST Drug Test (Within 30 Days)
Martell Electric
(1) JIW; Gull Lake Middle School - Lighting & Lighting Controls
Start Date: 6/12/2023; 7:00 AM - 3:30 PM; Approximately 3 Month Call
MUST Drug Test (Within 30 Days)
Hi-Tech Electric - Call Canceled
(0 of 1 Filled) JIW, AAM Maintenance - Three Rivers
Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call
MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.
Moore Electrical - #27
(1) JIW, Shop - Various Locations
Start 6/7/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, Drug Test, 2 forms of ID required
Moore Electrical - #28
(1) JIW, Shop - Various Locations
Start 6/7/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, Drug Test, 2 forms of ID required.
ShaumElectric- #1, Day Book
(2) JIW, Tek Modo, Three Rivers
Start: 6/6/23 @ 7:00AM;4-6 months
Michigan State License Required
Flemington Instrument(5/25) :#1, #11
2 JIW, Pfizer, Portage
Starts Wednesday, May31st at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.
Moore Electric- #7, #29, #11
(3) JIW, Shop - Various Locations
Start 5/30/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, MUST Drug Test, 2 forms of ID required
Hi-Tech Electric-Call Cancelled
(1) JIW,AAM Maintenance
Start: 5/24/23,10PM - 6AM,3Night Call
Michigan State License Required, MUST drug test, and Personal ID
Hi-Tech Electric-Call Cancelled
(1) JIW,AAM Maintenance
Start: 5/24/23,10PM - 6AM, 8 night Call through June 8th
Michigan State License Required, MUST drug test, and Personal ID
Hi-Tech Electric-#19
(1) JIW,Various Locations - Service Maintenance
Start: 5/23/23, 6:00AM-2:30PM Shift
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Gen3 Electric - #29, #30
(2) JIW's, Pfizer MAPS
Start 5/19/23, 7am-330PM
On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift
Hi-Tech Electric-
(1) CE,Various Locations
Start: 5/22/23, 7:00AM-3:30PM Shift
Michigan State License Required
Moore Electrical- #5
(1) JIW - Justice Facility
Start:May 22nd; 40 Hour Call; Indefinite
Background Check, Drug Testing,MI Journeyman License Required
Flemington Instrument: (2) Bk IIs
(2) JIW, Pfizer, Portage
Starts Tuesday, May 16th at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.
Hi-Tech Electric - #27
(1) JIW, American Axle, Three Rivers
Start: Monday, May 15th; 2nd Shift: 2PM-10:30PM (12 1/2% Shift Premium)
Michigan State License Required
Flemington Instrument-#2 & #25
(2) JIW, Pfizer, Portage
Start: 5/08/2023 @ 6:30AM; 5-10's; Duration: 6 Months
On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift
Moore Electrical - Day Book
(1) VDV Tech, Various Locations
Start: April 24th; 40 Hour Call; Indefinite
Background Check & Drug Testing Required
Climax Solar - Bk 2
() JIW, Various Locations
Start: Monday April 24th; M-F 6AM-2:30PM, OT Available; Indefinite Call
MI State JIW License Required; Residential Experience Preferred
Flemington Instrument -#22
(1) JIW, Pfizer, Portage
Start: 4/19/2023 @ 6:30AM; 5-10's; Duration: 3 Months
On-site Contractor Drug Testing
Shaum Electric - #13 & CE
(Filled) JIW, Tek Modo, Three Rivers
Start: 4/13/2023 @ 7:00AM; Duration TBD
Michigan State License Required
Hi-Tech Electric- #24 & (2) Book 2's
(3) JIW, Pfizer Portage Facility
Start: Wed. 4/12/23, 7AM - 3:30PM, One Month Call
Required: MI State License, MUST Drug Test in last 30 days, Background Check, and
Covid Vaccination required.
Moore Electric -
(1) CE - Shop
Start - Tuesday April 4th, 7:00AM Start
MUST Drug Test, Background Check, State License, Valid Drivers License
Shaum Electric - #13, #21, (1) Bk II
(3) JIW, Tek Modo, Three Rivers
Start 4/3/2023 @ 7:00AM; Duration 1+ Month Call
Michigan State JIW License Required
FE Moran - #9 & (2) Book 2's
(3) JIW, Pfizer Portage Site
Start 3/27/2023 @ 6AM, Schedule - 4-10's & OT Possible, subject to change - 3-4 Month Call
Onsite Drug Testing
Flemington Instrument- #1 & #7
(2) JIW, Pfizer Portage Site
Start 3/27/23 @ 7AM, Schedule - 5-10's & 8 on Sat. - 5 Month Call
Onsite Drug Testing & Driver's License Required, Must be willing to work OT
Moore Electric -
(1) CE - Shop
Start - Wednesday March 22, 2023
Hi-Tech Electric
(2) CEs, Outside, Inside, Commerical, Residential, Service Work, Various Location
Start: Monday, March 30, 2023; Indefinite Call
MI State License, Background Check, Contractor Drug Test
FE Moran- (2) Book 2's
(2) JIW, Pfizer MAPS Project, Fire Alarm
Start 3/1/23, 6:00AM Start, Four Tens-Schedule for 4-5 months, Possible OT
Michigan State Journey License, On-site Drug Testing, 2 forms of ID required
Hi-Tech Electric - #18
(1) JIW, Pfizer Portage Facility
Start: Monday2/20/23, 7AM - 3:30PM, One Month Call
Required: MI State License, MUST Drug Test in last 30 days, Background Check, and
Covid Vaccination required.
Hi-Tech Electric - Filled by CE
(1) CE, Commercial Work, Various Locations
Start: Monday, 2/20/2023, Indefinite Call
Required: MI State License, MUST Drug Test, Background Check, COVID-19 Vaccination
Climax Solar - #19 & Book 2
(2) JIW, Residential Solar Work, VariousLocations
Start: 2/13/23 @ 6:00AM M-F, Indefinite Call
MI State License Required, Long Hours, Shift Length Varies
Flemington Instrument(#8)
(1) JIW, Pfizer Portage Site
Start:2/14/23 @ 6:45AM, 6 Month Call, OT Available
Michigan State Journeyman Licenses, 2 forms of ID, Online Orientation to be completed Friday by 3PM for Tuesday Start
Flemington Instrument - (#1 & #17)
(2) JIW, Pfizer Portage Site
Start:2/6/23 @ 6:45AM, 5-6 Month Call, OT Available
Michigan State Journeyman Licenses & 2 forms of ID
Schwartz Electric - (#5)
(1) JIW,Heartland RV (new construction), Sturgis MI
Start 1/30/23, 7AM to 3:30PM, M-F, Indefinite
Michigan State Journeyman License & 2 forms of ID Required
FE Moran(Book 1 - #1, #3)
(2) JIW, Pfizer MAPS Project, Fire Alarm
Start 1/30/23 *corrected*, 6:30AM Start, Four Tens-Schedule for 4-5 months
Michigan State Journey License, On-site Drug Testing, 2 forms of ID required
Moore Electric- Book 1 (#1 & #27), (1) Book 2
(0 of 3 open) JIW, Pfizer Shutdown Work, Portage
Start 1/25/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23
MI State License, Background Check, MUST Drug Test within 30 days before reporting to work,
COVID-19 Vaccination Required
Paperwork & orientation must be completed by noon Friday to report Monday
Moore ElectricFilled Book II
(2) JIW, Pfizer Portage Site
Start 1/23/23, 7AM Start, 10 hours Monday thru Friday, 8 Hours Sat.
MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,
Paperwork & orientation must be completed by noon Friday to report Monday
Hi-Tech Electric
(1) CE, Various Locations
Start 1/23/23, 7AM to 3:30PM
MI State License Required
Moore Electric - #21, #23, (2) Book 2
(4 of 4 filled) JIW, Pfizer Shutdown Work, Portage
Start 1/16/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23
MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,
Paperwork & orientation must be completed by noon Friday to report Monday
Nitro Electric - Book 2
(1) JIW, Aldis, Sturgis Michigan
Start 1/9/23, 7AM to 3:30PM, 2 weeks
Michigan State Electrical License Required
KEI Electric - 2 Book 1
(2) JIW, Various Locations
Start 1/5/23, 40 hrs 7AM-3:30, Indefinite
Current MUST Drug Test required
Schwartz Electric
(1) JIW, Heartland RV, Sturgis MI
Start 12/27/22, 7AM to 3:30PM, Indefinite
Michigan State License and 2 forms of ID Required
Climax Construction
(1)CE, Residential Solar, various locations
Start 12/23/22, 6AM Start, Indefinite Call
Current MUST Drug Test and Background Check Required
Moore Electric - filled by #38, 36, & (2 Book 2's)
(1 of 4 open) JIW, Pfizer Portage Site
Start 12/19/22, Indefinite, 7AM to 3:30 PM 40 hours-a-week
Full Covid-19 Vaccination Required,Must Drug Test last 30 days before reporting to site, 2-3 day background check before reporting to site, Masks required on site
Climax Construction
(1)CE, Residential Solar, various locations
Start 12/13/22, 6AM Start, Indefinite Call
Current MUST Drug Test and Background Check Required
Hi-Tech Electric
(1) CE, Service Truck
Start 12/12/22, 1st Shift
Michigan State License Required
IBID County ElectricBook I #8, #22, #34, #39, #40 Book II #8
(6) JIW, Welch Foods Inc, Lawton MI
Start 11/22/22, 6AM to 4:30PM, 7 Days a Week for 2 Months
Michigan State License and Masks are required on site
IBID County Electric - Filled by (4) Book 2's (daybook)
(0 of 4 open) JIW, Welch Foods Inc, Lawton MI
Start 11/16/22, 6AM to 4:30PM, 7 Days a Week for 2 Months
Michigan State License and Masks are required on site
Shaum Electric - Filled by Book I #36 & day book, (3) Book 2,
(0 of 5 Open) JIW Tekmodo Moldings, Three Rivers
Start 11/07/22, 7AM to 3:30PM, 5 Month Call
Michigan State Journey License Required
Moore Electrical(Filled by # 1, #39, 2 Book 2's)
(4) JIW, Pfizer
Starting Monday, October 31st; 7:00am-3:30pm
Required: MUST Drug Test (within 60 days), MI State License, Background Check (2-3 days),COVID Vaccination
Climax Solar -
CE, Commercial/Residential Solar Work
Start 9/27 at 6:00am with Regular OT
Michigan State License Required.
IBID County Electric-
(1) CE, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment
Start November 7th; Duration 2-3 Months
4 x 10's, OT Fridays & Saturdays, Working some Sundays, 6 AM Start
Required: MI State License, Masks, Safety Toed Shoes & Glasses
IBID County Electric - Filled by #3, #4 & Book 2
(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment
Start November 2nd; Duration 2-3 Months
4 x 10's, OT Fridays & Saturdays, Working some Sundays
Required: MI State License, Masks, Safety Toed Shoes & Glasses
IBID County Electric - Filled by #39 & 40, Book 2
(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment
Start October 26th; Duration 2-3 Months
4 x 10's (Mon-Thurs); OT on Fri, Sat, and Some Sundays
Required: MI State License, Masks, Safety Toed Shoes & Safety Glasses
J-Ranck - Filled by #10
(1) JIW, Various Location, Pump Stations
Start 10/24/22, 7AM-5:30PM, 4-10 Sched.
2 Forms of ID Required
Shaum Electric - Filled by Book I # 10 & 31
(2) JIW Tekmodo Moldings, Three Rivers
Start 10/17/22, 7AM to 3:30PM, 6 Month Call
Michigan State Journey License Required
Climax Solar - Filled by #42
(1) JIW, Residential/Service Solar Work
Start 10/10/22, 6AM start with regular OT
Michigan State License Required
Moore Electric
(1) CE3, Zoetis Farms, Kalamazoo
Start 10/5/22, 7AM to 3:30PM, Indefinite
Must Drug Test and Background Check require
IBID County Electric - Filled by Book 1 #1
(1) JIW, Welch's, Paw Paw
4x10's with OT on Friday & Saturday; 2-3 Month Call.
Michigan state license, safety glasses, hardhat, steel toed shoes, and masks are all required.
Lakeland Electrical - (2)Book 2 #36 & (1) Book 1 Daybook
(0of 3 Open) JIW, Pfizer MAPS, Portage
Start Monday, October 3rd. Long Call. 7:00AM-3:30PM M-F; OT When Necessary
Onsite & Random drug testing; Background Check Required
No COVID vaccination or mask mandate required.
Ibid County Electric - (Filled by Book 2)
(1) JIW, Welch's in Lawton, MI
Start 9/29/22, hours 6AM to 4:30 PM, 4/10's with OT on Friday and Saturday
MI State Journeyman Electrical License, Masks, and PPE required.
Moore Electric (Book I #13, Book I Day Book, Book II - Day Book x 2)
(0 of 4 open) JIW, Zoetis (Various Locales),
Start 9/29/22, OVERTIME; 6AM to 3:30 PM M-F
MUST Drug test within 30 days of Hire, Background Check required
Moore Electric- Filled by#42
(2) JIW, Pfizer Portage Site
Start 9/28/22, 7 AM to 3:30 PM, M-F
Current Must drug test (within 30 days of hire), Background Check, Covid-19 Vaccination,
and Masks are required
Lakeland Electric (Book I #43, #43)
(2) JIW, Pfizer Maps, Kalamazoo
Start Monday, September 26, Long Call, 7:00AM to 3:30PM, OT When Necessary
Onsite& Random Drug Testing, Background Check Required.
No COVID Vaccines or Masks Needed
Moore Electrical - Filled by Book 1 #39
(1) JIW, Zoetis, Kalamazoo
Start 9/12, Long Call, 7:00AM to 3:30PM
Current MUST Drug Test, Background Check, and MI State License Required
Schwartz Electric -Filled by Book1 #44, #42
(2) JIW, Sturgis Michigan, New Industrial Build
Start 9/9, Long Call, 7AM to 3:30PM
Current Must Drug Test and MI State Journeyman License Required
Lakeland Electric - Filled by (2) Book 1 #32 & #44 and (2) Book 2
(4) JIW, Pfizer MAPS Project, New build pharmaceutical facility
Start, Long Call 6+ Months, 7:00AM to 3:30PM, OT as needed
On-Site Drug Testing Required, may be subject to random testing. Background Check required.
No Covid-19 Vaccine requirement.
KEI Electric - Filled by (3) Book 1: #40, #47, #41 & (4) Book 2
(7) JIW, Day Shift for Graphic Packaging Annual Shutdown
Report 9/9 for paperwork. Shutdown is 4 days, 9/12 to 9/15.
First Shift, 12 hours, 6AM-6PM
KEI Electric - Filled by (1) Book 1: #39 & (4) Book 2's
(5) JIW, Night Shift for Graphic Packaging Annual Shutdown
Report 9/9 for paperwork. Shutdown is 3 nights minimum, 9/12 to 9/14.
Night Shift, 12 hour, 6PM-6AM, All hours paid @ OT (1.5x)
Lakeland Electric
No JIW Call at this time, previous call due to request error
Brite Electric
(1) JIW, Drive and Shine (S Westnedge), Kalamazoo
Start 8/31/22, 7AM to 3:30 PM, 8 to 12 weeks
Michigan State Journeyman License is required
Hi Tech Electric
(1) CE, Commercial and Industrial
Start 8/25/2022, Indefinite
Climax Solar
(1) CE for Residential Solar Work
Start 8/29/22, 6AM
IBID County Electric
(1) JIW, Welch's Foods (Lawton, MI)
Start, 8/23, 4-10s, Mon-Thurs, likely Friday (OT) as well. 6:00AM to 4:30PM
MI State License Required
Lakeland Electric
(2) JIW, Pfizer MAPS Project
Start 8/23/22, 12-24 month Call, 7:00AM to 3:30PM
On-Site Drug Testing Required, may be subject to random testing. Background Check required. (Edit) No Covid-19 Vaccine requirement.
Climax Solar
(1) CE, Residential Solar Service
Start: 8/15/22
MI State License Required
Shaum Electric
(1) JIW, New Construction, Three Rivers, MI
Start:8/10/22, Duration: 6-8 Months, M-F 7AM-3:30PM
MI State License, Lift certification Required, 2-forms of ID required for Hiring Papers
Moore Electric
(2) JIW, Pfizer-Portage - (1) Cancelled
Start 08/9/22, Indefinite call 7:00AM to 3:30PM
Drug Test within last 30 Days, MI Lic. Journeyman, Background Check, Cov-19 Vaccine, Masks
Required onsite
Martell Electric
(1) JIW, Gull Lake Middle School
Start 8/8, Short Call 1-2 weeks
4-10 Schedule
Drug Test Required within 30 days of start
Climax Solar
(1) JIW, Residential Solar Work
Start 8/3,Long Term/Indefinite Call
6:00AM to 5:00PM, Regularly available OT. Some Mondays Off
MI Journeyman License Required
Moore Electrical
(1) JIW, Pfizer - Misc.
Report to Moore Shop on 8/3/22
40+ hrs - Occasional OT as needed
Drug Test within last 30 days, Background Check, Covid-19 Vaccine, and Masks required